Hits:
Indexed by:Essay collection
Translation or Not:no
Included Journals:EI
Pre One:An Integrated Model for Assembly Line Balancing and AGV Scheduling in the wake of industry 4.0.
Next One:Multi-Level Rolling Horizon Planning and Scheduling Integrated with Material Constraints using DBR Approach: A Heuristic for Smart Manufacturing.