Hits:
Indexed by:Journal paper
Discipline:Engineering
Translation or Not:no
Included Journals:SCI
Pre One:Energy-efficient scheduling of a two-stage flexible printed circuit board flow shop using a hybrid Pareto spider monkey optimisation algorithm.
Next One:Hybrid Spider Monkey Optimization Algorithm for Multi-Level Planning and Scheduling Problems of Assembly Lines.